<?xml version="1.0" encoding="UTF-8"?>
<rss version="2.0"
     xmlns:content="http://purl.org/rss/1.0/modules/content/"
     xmlns:dc="https://purl.org/dc/elements/1.1/"
     xmlns:dcterms="http://purl.org/dc/terms/"
     xmlns:media="http://search.yahoo.com/mrss/"
     xmlns:atom="http://www.w3.org/2005/Atom"
     xmlns:cf="https://www.futureplc.com/rss/content-flags"
>
    <channel>
                    <atom:link href="https://www.tvtechnology.com/feeds/tag/full-power-tv-stations" rel="self" type="application/rss+xml" />
                            <title><![CDATA[ Latest from Tv Technology in Full-power-tv-stations ]]></title>
                <link>https://www.tvtechnology.com/tag/full-power-tv-stations</link>
        <description><![CDATA[ All the latest full-power-tv-stations content from the Tv Technology team ]]></description>
                                    <lastBuildDate>Mon, 22 Jul 2019 17:56:44 +0000</lastBuildDate>
                            <language>en</language>
                                <item>
                                                            <title><![CDATA[ FCC Lifts Modification Freeze for Full Power and Class A TV Stations ]]></title>
                                                                                                                                                                                                <link>https://www.tvtechnology.com/repack/fcc-lifts-modification-freeze-for-full-power-and-class-a-tv-stations</link>
                                                                            <description>
                            <![CDATA[ For stations still transitioning as part of repack, minor modification applications can be filed for the first time in six years. ]]>
                                                                                                            </description>
                                                                                                                                <guid isPermaLink="false">eG7xfk8skSRwNZxhYkuWoW</guid>
                                                                                                <enclosure url="https://cdn.mos.cms.futurecdn.net/jhQFwBsyb8kWvJV59v6C8f-1280-80.jpg" type="image/jpeg" length="0"></enclosure>
                                                                        <pubDate>Mon, 22 Jul 2019 17:56:44 +0000</pubDate>                                                                                                                                                                                                                                <category><![CDATA[FCC]]></category>
                                                    <category><![CDATA[Regulatory &amp; Legal]]></category>
                                                                                                                    <dc:creator><![CDATA[ Michael Balderston ]]></dc:creator>                                                                                                        <dc:description><![CDATA[ null ]]></dc:description>
                                                                                                                                <cf:isSponsored>false</cf:isSponsored>
                <cf:hasAffiliateLinks>false</cf:hasAffiliateLinks>
                <cf:isPaid>false</cf:isPaid>
                                                                                                                                <media:content type="image/jpeg" url="https://cdn.mos.cms.futurecdn.net/jhQFwBsyb8kWvJV59v6C8f-1280-80.jpg">
                                                            <media:credit><![CDATA[null]]></media:credit>
                                                                                                                                                                                                                                                                                                                                                    </media:content>
                                                    <media:thumbnail url="https://cdn.mos.cms.futurecdn.net/jhQFwBsyb8kWvJV59v6C8f-1280-80.jpg" />
                                                                                                                                                                    <content:encoded >
                            <![CDATA[
                            <article>
                                <p><strong>WASHINGTON—</strong>While the recent summer heat wave has melted nearly everything frozen, the FCC is doing its own kind of melting with the Media Bureau announcing a lift on the freeze imposed on the filing and processing of minor modification applications for full power and Class A stations.</p><figure class="van-image-figure pull-" data-bordeaux-image-check ><div class='image-full-width-wrapper'><div class='image-widthsetter' ><p class="vanilla-image-block" style="padding-top:56.25%;"><img id="jhQFwBsyb8kWvJV59v6C8f" name="" alt="" src="https://cdn.mos.cms.futurecdn.net/jhQFwBsyb8kWvJV59v6C8f.jpg" mos="https://cdn.mos.cms.futurecdn.net/jhQFwBsyb8kWvJV59v6C8f.jpg" align="" fullscreen="" width="" height="" attribution="" endorsement="" class="pull-"></p></div></div></figure><p>Thanks to the now reopen application process—which was initially ceased on April 5, 2013—full power stations can apply for an increase to its noise-limited contour, while Class A stations can file to increase its protected contour, in one or more directions beyond the station’s authorized facilities. These actions are limited to full power and Class A stations that were reassigned to new channels as part of the repack and have yet to complete the transition to their post-auction channels.</p><p>While the freeze was in effect, stations had to apply for a waiver to complete their transition in instances of an antenna not exactly matching the previously authorized antenna pattern or the authorized height of the antenna on a station’s tower differs from the actual installed height. Lifting the freeze is designed to relieve stations of these steps as they move through the repack process.</p><p>The freeze is only lifted for the qualified stations, remaining in place for all others.</p><p>Minor modification applications will be processed on a first-come-first-served basis, with the filing of an acceptable application cutting off the filing rights of subsequent, conflicting applications.</p><p>More information is available by visiting fcc.gov/media.</p><p><em>For more information on the repack, visit TV Technology's <a href="https://www.tvtechnology.com/repack" data-original-url="http://www.tvtechnology.com/repack">repack silo</a>.</em></p>
                                                            </article>
                            ]]>
                        </content:encoded>
                                                </item>
            </channel>
</rss>