/
07.13.2007
Originally featured on BroadcastEngineering.com
Nucomm adds space for 2GHz BAS project

Nucomm is streamlining its services through the acquisition of an additional light industrial, high ceiling, high-bay warehouse space. As Nucomm continues to grow, the 11,500sq-ft finished goods area was purchased to enhance the company's efficiency.

The new facility is located adjacent to Nucomm's Hackettstown, NJ, headquarters and will be used to store equipment being built to assist broadcasters in their efforts to meet the requirements of the Sprint Nextel BAS relocation project.

Nearly 8000sq ft will be used for storing finished products, and 350ft will be dedicated to value added operations, including integrating the control, radio and antenna systems to prevent potential downstream installation problems on location.

For more information, visit www.nucomm.com.



Comments
Post New Comment
If you are already a member, or would like to receive email alerts as new comments are
made, please login or register.

Enter the code shown above:

(Note: If you cannot read the numbers in the above
image, reload the page to generate a new one.)

No Comments Found




Thursday 2:01PM
IBC APP Now Available
I downloaded the app and found it useful for my main IBC pitfall


 
Featured Articles
Discover TV Technology