06.12.2003 12:00 PM
New collector inductive output tubes minimize operating costs

Three- and five-stage water cooled tubes will be available this summer from e2v. A five-stage oil-cooled device will follow.

As natural combinations of e2v's plug-in IOT and depressed collector klystron technologies, the ESCIOTs have been designed to improve efficiency while capitalizing on value, extensive heritage and ease of use.

The new ESCIOTs can provide up to 60 percent efficiency, thereby maximizing operating efficiency and minimizing operator energy costs.

For more information visit http://e2vtechnologies.com.

Back to the top




Comments
Post New Comment
If you are already a member, or would like to receive email alerts as new comments are
made, please login or register.

Enter the code shown above:

(Note: If you cannot read the numbers in the above
image, reload the page to generate a new one.)

No Comments Found




Wednesday 11:59 PM
Peer Profile: Tomaž Lovsin, STN, Slovenia
“Will there be a shift from coax to fibre? Or a mixture between the two which will require hybrid solutions to be implemented?”

Wall Street Communications /   Wednesday 07:02 PM
SMPTE Announces 2014 Honorees and Award Winners
HighRez /   Tuesday 02:21 PM
Over The Air and Cable TV: Far From Dead

 
Featured Articles
Discover TV Technology