01.14.2005 12:00 AM
Frequency Coordination Kicks in for Inauguration
If you need frequency coordination for covering the inauguration, save this contact info:
Robert Denney Jr. at (301) 686-1801 or e-mail Denney.

The FCC has designated Denney of Denney & Associates as the point of contact for auxiliary broadcast frequency coordination for the 2005 presidential inauguration in Washington. The Washington Executive Broadcast Engineers Frequency Coordinators Inc. asked the commission to select such a coordinator.

Part 74, 78 and 101 licensees sharing spectrum available under Part 74 of the FCC rules and operating in the designated area are covered by this action. The area is defined as a 100 kilometer radius of Lafayette Park across from the White House for terrestrial stations; and as a 150 kilometer radius for mobile operations originating onboard aircraft.

The commission used a similar coordination arrangement for the 2004 political conventions, 2002 Olympics and the previous inauguration.


(Radio World)


Comments
Post New Comment
If you are already a member, or would like to receive email alerts as new comments are
made, please login or register.

Enter the code shown above:

(Note: If you cannot read the numbers in the above
image, reload the page to generate a new one.)

No Comments Found




Thursday 10:05 AM
NAB Requests Expedited Review of Spectrum Auction Lawsuit
“Broadcasters assigned to new channels following the auction could be forced to accept reductions in their coverage area and population served, with no practical remedy.” ~NAB

Wall Street Communications /   Friday 06:54 PM
ChyronHego Products at Content and Communications World (CCW):
Sue Sillitoe, White Noise PR /   Friday 05:52 AM
Visual Unity Shows vuMedia™ at NAT Expo 2014 and Inter BEE 2014

 
Featured Articles
Discover TV Technology