12.11.2009 09:59 AM
M&T Bank Stadium upgrades to Daktronics LED video system

Daktronics will design, manufacture and install new large-screen video displays at M&T Bank Stadium, home of the NFL’s Baltimore Ravens.

The multimillion-dollar upgrade project includes two large end zone video displays, video processors and the company’s new Show Control system. The upgrade will dramatically lower energy usage by eliminating the need for 54 tons of cooling required by the old system.

Daktronics will provide its HD-16 LED video technology in the stadium, retrofitting it into the existing end zone structures. Each display will measure approximately 24ft by 100ft. HD-16 technology provides wide-angle viewing for better visibility for more fans, increased contrast and high image clarity with the ability to display 4.4 trillion shades of color.

Included in the upgrade project are Daktronics video image-processing technologies and the Show Control system. The control system provides a combination of control software, data integration and playback hardware that forms a single production solution.



Comments
Post New Comment
If you are already a member, or would like to receive email alerts as new comments are
made, please login or register.

Enter the code shown above:

(Note: If you cannot read the numbers in the above
image, reload the page to generate a new one.)

No Comments Found




Thursday 10:05 AM
NAB Requests Expedited Review of Spectrum Auction Lawsuit
“Broadcasters assigned to new channels following the auction could be forced to accept reductions in their coverage area and population served, with no practical remedy.” ~NAB

Sue Sillitoe, White Noise PR /   Thursday 09:10 AM
Fairlight Unveils the Next Generation of Audio Post Production
Wall Street Communications /   Thursday 01:00 PM
NUGEN Audio AES Product Preview

 
Featured Articles
Discover TV Technology