10.22.2010 05:05 PM
Broadcast Pix goes into East Carolina University Stadium control room

When the East Carolina University (ECU) Pirates host teams at Dowdy-Ficklen Stadium in Greenville, NC, fans are seeing major changes. The stadium, which was renovated in time for this year's football season, has added about 7000 seats and a new 16:9 jumbo video screen and scoreboard. Video displayed on these screens is being produced with a new Broadcast Pix Slate 1000 video production system.

In the past, ECU Athletics would rent a production truck and hire local television station personnel to produce the stadium's video presentation. Now, below the video scoreboard in the stadium, a control room has been built to provide a permanent production solution.

In addition, five new Panasonic AG-HPX500 HD cameras with Fujinon lenses are positioned around the stadium to capture game action, crowd shots, halftime activities and any presentations or ceremonies on the field during game breaks. The Broadcast Pix system was purchased from Technical Video Systems in Cary, NC.

The team also uses a number of Broadcast Pix Fluent workflow tools during game coverage, including Fluent Clip Store, which is used to run commercials during the game, and Fluent Macros, which is used to create an animated ECU Pirates wipe. In addition, the built-in Fluent Multi-View reduced the number of monitors needed in the control room.

ECU Athletics was attracted to the Slate 1000 because of its affordable price and a familiarity with the system through other departments at the school. The Slate systems create affordable hybrid HD/SD/analog productions, and integrate well with the suite of Fluent file-based software tools, including clip and graphic stores, CG, multiview, watch-folders and macros.



Comments
Post New Comment
If you are already a member, or would like to receive email alerts as new comments are
made, please login or register.

Enter the code shown above:

(Note: If you cannot read the numbers in the above
image, reload the page to generate a new one.)

No Comments Found




Tuesday 06:00 AM
Eleven FCC Scenarios for The 600 MHz Band Plan
I suspect that the estimated $44 billion of auction proceeds do not take into account the fact that some spectrum the FCC will buy cannot be resold because it must be used as guard intervals in the 600 MHz band plan.~ Charles W. Rhodes

Wall Street Communications /   Friday 07:53 PM
Archimedia Technology at the 2015 NAB Show

 
Featured Articles
Discover TV Technology