05.24.2013 11:00 AM
ScheduALL to release ScheduALL 5 with smart technology
ScheduALL 5 automates previously labor-intensive functions such as slack capacity optimization, media system integration and third-party connectivity.

ScheduALL will release its next-generation scheduling, now with smart technology, on May 31.

ScheduALL 5 automates previously labor-intensive functions such as slack capacity optimization, media system integration and third-party connectivity. It is designed to bridge the gap between human-based and automated processes.

S5 precisely addresses the complexitites of media, broadcast and transmission businesses. The smart technology in S5 automates workflow based on tunable business parameters that are required for each project. Workflow parameters that S5 manages include deadlines, priorities, earliest start times, freeze times and durations. This smart workflow capability will connect, trigger and manage the entire workflow process.

 



Comments
Post New Comment
If you are already a member, or would like to receive email alerts as new comments are
made, please login or register.

Enter the code shown above:

(Note: If you cannot read the numbers in the above
image, reload the page to generate a new one.)

No Comments Found




Tuesday 03:07 PM
WMUR-TV Says FAA Drone Rules Preclude ENG
The FAA’s current rules and proposed ban on flight over people, requirement of visual line of sight and restriction on nighttime flying, effectively prohibit broadcasters from using UAS for newsgathering. ~ WMUR-TV General Manager Jeff Bartlett


 
Featured Articles
Product News
Discover TV Technology