09.03.2008 11:22 AM
QVC to implement Quintiq's scheduling system

QVC has selected Quintiq’s Multi-Resource Scheduling (MRS) solution to integrate the its scheduling and planning needs into one single system.

The MRS system will help QVC organize and track its broadcasting resources, with the goal of reducing the amount of time spent on scheduling as well as to provide full transparency and real-time planning. The system will integrate schedule changes into the existing workflow.

With Quintiq's MRS solution, all QVC schedulers will have access to the same real-time data regarding studios, equipment, available personnel, vehicles and current shoots. All resource availability information will be accessible in one centralized location, which greatly simplifies the scheduling process. With a clear overview of resources, double booking and over booking can be eliminated. MRS features powerful tools that oversee rotating shifts, warn of any potential conflicts and automatically match staff with task requirements.

For more information, visit www.quintiq.com.



Comments
Post New Comment
If you are already a member, or would like to receive email alerts as new comments are
made, please login or register.

Enter the code shown above:

(Note: If you cannot read the numbers in the above
image, reload the page to generate a new one.)

No Comments Found




Thursday 10:05 AM
NAB Requests Expedited Review of Spectrum Auction Lawsuit
“Broadcasters assigned to new channels following the auction could be forced to accept reductions in their coverage area and population served, with no practical remedy.” ~NAB

Sue Sillitoe, White Noise PR /   Tuesday 10:20 AM
Visual Unity Strengthens Its Marketing Team
Brian Galante /   Tuesday 11:49 AM
TNDV Mobile Production Fleet Grows with Elevation

 
Featured Articles
Discover TV Technology