11.14.2002 04:03 PM
NBC Moves Ahead With Kostow Greenwood
Kostow Greenwood Architects (KGA), the firm designing the new CNN New York Broadcast Center, has been awarded the NBC EJ/PVT/Designworks (Electronic Journalism/Production Video Tape/Designworks) Consolidation Project. The 25,000-square-foot project involves the renovation of the fifth floor at 30 Rock. Scheduled for completion in 2004, the undertaking will consolidate digital editing and graphics production for NBC's news and sports programs into a single centralized facility. Plans for the space call for a central control desk, nonlinear editing, online edit rooms, and a playback and ingest area. The digital graphics department, dubbing department, media library, a large equipment room, and an equipment maintenance shop will complete the space.


Comments
Post New Comment
If you are already a member, or would like to receive email alerts as new comments are
made, please login or register.

Enter the code shown above:

(Note: If you cannot read the numbers in the above
image, reload the page to generate a new one.)

No Comments Found




Thursday 10:05 AM
NAB Requests Expedited Review of Spectrum Auction Lawsuit
“Broadcasters assigned to new channels following the auction could be forced to accept reductions in their coverage area and population served, with no practical remedy.” ~NAB


 
Featured Articles
News Technology
News Technology
Discover TV Technology