/
06.20.2012 01:21PM
Utah Scientific Routes Wright State University Arena Control Room
Second UTAH-400 reduces configuration time
SALT LAKE CITY: Utah Scientific said Wright State University has deployed its equipment in its newly renovated control room at the Nutter Center, the university’s 10,000-seat sports arena. The new control room is part of an overhaul of the arena’s video production system to support full HD video.

The university’s Video Technology Services unit installed a Utah-400/144 routing switcher to bridge all of the production system components. The Utah-400 dynamically allocates sources to switchers, monitors, and replay systems, and outputs signals to recordings, air feeds, encoders, and arena signage and displays.

The university also installed an SC-4 system controller, a UCP-SX full matrix control panel, four UCP-36 single bus control panels, and a SoftPanel-2 GUI control panel system. The full matrix panel is used to configure the system before each production, while the others change content during events.

This is the second Utah-400 routing system on the Wright State campus.



Comments
Post New Comment
If you are already a member, or would like to receive email alerts as new comments are
made, please login or register.

Enter the code shown above:

(Note: If you cannot read the numbers in the above
image, reload the page to generate a new one.)

No Comments Found




Friday 3:00PM
Google Debuts Android TV
“We’re simply giving TV the same level of attention that phones and tablets have traditionally enjoyed.” ~ David Burke, Google


 
Featured Articles
Discover TV Technology